Customer name confidential
Challenge
A modular heat-supply solution was required with minimal site works.
Solution
A factory-built block-modular boiler plant.
Ukrainian engineering and manufacturing company in energy, industrial equipment and infrastructure solutions.

Customer name confidential
A modular heat-supply solution was required with minimal site works.
A factory-built block-modular boiler plant.
Have a project or technical requirement? Talk to the Teploenergo engineering team.